2012

schematic

While the proposed Oak Bluffs roundabout has received most of the press, Tisbury is quietly moving forward with another long-planned major traffic management infrastructure project: a proposed system of connector roads that would link Edgartown-Vineyard Haven Road to State Road and bypass the summer crush in Vineyard Haven. But unlike the roundabout, the state hasn’t been forthcoming with money for the proposed $3 million project. Now it’s up to voters to decide whether to build the connector system.

Concern over traffic and parking problems in Edgartown’s historic town center has spread all the way to Boston.

To Northeastern University, specifically, where a group of transportation engineering students have tackled the town’s traffic situation as part of their senior project.

2011

A Martha’s Vineyard Commission subcommittee decided this week to require a new traffic study for a proposed fuel station off State Road in Vineyard Haven, but not before a bit of open disagreement on the merits.

2008

cars

The automobile has long been an integral part of American life; there are 40 million more registered motor vehicles in this country than licensed drivers.

Yet on Vineyard sidewalks and bike paths this week, people cruised along on bicycles with no worries about traffic and congestion. The parking lots for the Tisbury and Edgartown park and ride programs were jammed full, while bus stops for the Martha’s Vineyard Transit Authority were packed with people waiting to be picked up at all hours of the day.

1929

An automatic traffic signal has been placed in Monument Square, Oak Bluffs, the first traffic signal in southeastern Massachusetts to be accepted and approved by the Department of Public Works, according to town officials. With five streets opening into the square and carrying the bulk of Island traffic, this signal splits and divides the stream of vehicles in a way calculated to eliminate practically all confusion.

Pages